Professional Audio Patch Planner

AUDIOPATCH — Your Patch. Documented.

And more.

Stage Patching & Input Lists.

Create input lists, manage FOH and Monitor splits, and organize stage signals into physical drop-boxes.

  • Input Management: Build lists with channels, inputs, and integrated microphone assignments.
  • Master Splits: Manage FOH, Monitor, and Broadcast splits centrally. Gain sharing hierarchies are documented automatically.
  • Looms & Sub-snakes: Group stage signals into physical drop-boxes (Looms A-Z) with automatic position assignment.
Patch Table Loom Planning Loom Settings

Smart Import.

Paste input lists from PDF riders or Excel directly into the patch. The system automatically maps columns for channels, inputs, and microphones.

  • Smart Mapping: Automatically detects CH, Input, Mic, and Stand columns.
  • Merge Tools: Keep your existing festival patch and just merge the guest band's inputs.
  • Error Checking: Flags duplicate channels and phantom power conflicts.
Smart Import Equipment Setup

Festival Mode.

Configure a master festival system and manage independent patch sheets for individual bands.

  • Master Patch: Route global festival tielines once for the whole weekend.
  • Band Overrides: Manage specific inputs for each act without altering the master house patch.
  • Instant Changeovers: Keep the crew synced during fast band switches.
Festival Changeover Festival Master Festival Band Split

Live Collaboration & Crew Link.

Collaborate on projects in real-time. Multiple engineers can edit the patch simultaneously. Generate read-only Crew Links to provide mobile access to the current routing.

  • Live Sync: Edit patches and assign looms at the same time as your colleagues, without conflicting overrides.
  • Conflict-Free: FOH and Monitor engineers can edit the same patch simultaneously. The system safely merges all changes in real-time.
  • Crew Link: The crew always has the latest, live routing in their pocket. No more last-minute paper waste.
Crew Link Modal Crew Link Live Collaboration
Crew Link Mobile

Inventory & Rack Builder.

Generate precise equipment lists from your patch data. Organize planned material into transport cases and build hardware racks.

  • Hardware Planning: Keep track of all required stagebox racks, multi-pins, and sub-snakes for the production.
  • Case Packing: Sort cables, mics, and accessories into logical flight cases for the truck.
  • Visual Rack Builder: Design FOH and stage racks virtually with all your planned hardware.
Inventory & Cases Rack Builder

System Designer.

Design digital and analog networks visually. The workspace automatically imports your configured consoles and stageboxes, so you never start from scratch.

  • Visual Routing: Map hardware splits, stageboxes, and multi-pin tielines via drag & drop.
  • Network Architecture: Plan complete AES50, Dante, and MADI topologies between consoles and racks.
  • Custom I/O: Define bespoke multipin patchbays and analog snake routes.
System Architecture Overview Cable & IP Lists Project Network Notes System Architecture Export

PDF & Excel Export.

Generate highly informative patch sheets and Excel workbooks detailing your entire system architecture.

  • Comprehensive Overviews: Export lists containing all planned routings, inputs, and hardware.
  • Isolated Splits: Print dedicated, isolated patch sheets for specific mixing positions (FOH, MON).
  • Custom Branding (PRO): Add your company logo to exports and cover pages.
PDF Cover Sheet PDF Stage Patch Excel Export

A true engineering database. Not just text labels.

AudioPatch is powered by an exact hardware database covering 142 verified consoles, stageboxes, and controllers. Every device knows its physical and digital properties.

Consoles, Slot Cards & Controllers (DirectOut)

Physical port configurations, custom expansion cards, and controllers from DiGiCo, Yamaha, Avid to DirectOut Prodigy.

Precise Rack Dimensions

Millimeter-accurate HE (Rack Unit) heights and mounting depths for drag & drop rack design.

Port-Level Routing

Native intelligence for Dante, MADI, AES50, and analog I/O. Connections are strictly validated.

Modular Stageboxes

Configure complex modular I/O cards (e.g. DiGiCo SD-Racks, dLive MixRacks) just like in reality.

DiGiCo SD/Quantum Avid VENUE S6L Yamaha RIVAGE/CL/QL Allen & Heath dLive SSL Live Midas M32 Soundcraft Vi XTA DirectOut Meyer Sound Focusrite Lake Universal Audio

Pricing.

AudioPatch Core

Free forever

The ultimate patching engine for basic setups. Built by techs, for techs.

  • ✓ 2 Active Projects
  • ✓ 1 Free PDF & Excel Export
  • ✓ Stage Input Lists & Auto Loom
  • ✓ Smart Import (Excel/PDF)
  • ✓ Festival Mode (Multi-Band)
  • ✓ Packliste & Cases (Auto-calc)
  • ✓ 1000+ Mic & Hardware Database
Start Planning for Free

AudioPatch Tech

$4 / month

Advanced system design and real-time collaboration for individual system engineers.

  • ✓ 1 User (up to 2 devices)
  • + Unlimited Projects & Exports
  • + System Designer (Visual Routing)
  • + Live Collab & Crew Link
  • + Branding-Free PDF (No watermark)
Start 7-Day Free Trial

AudioPatch Company

$19 / month

For touring companies and large crews requiring team licenses and custom corporate branding.

  • ✓ 10 Pro Licenses (up to 10 devices)
  • + Everything in Tech
  • + Centralized Billing
  • + Custom Branding (Logos on exports)
  • + Priority Email Support
Start 7-Day Free Trial

Frequently Asked Questions

Is AUDIOPATCH really free?▼
Yes, the core app (patching, loom planning, tieline routing, and 1 free PDF/Excel export) is completely free forever. For advanced touring requirements, we offer AudioPatch Pro, which unlocks unlimited PDF/Excel exports, the System Designer, Real-Time Collaboration, and Crew Link. You can try all Pro features with a 7-day free trial.
Do I need an account?▼
No. AUDIOPATCH works entirely in your browser with no login required. Your projects are saved locally. You can export and import project files to share with colleagues.
Which consoles are supported?▼
AUDIOPATCH supports over 1000 verified devices including DiGiCo (SD, Quantum), Avid (VENUE S6L), Yamaha (RIVAGE, CL, QL, TF), Allen & Heath (dLive, Avantis, SQ), SSL (Live), Midas (Heritage D, M32), Soundcraft (Vi), plus hundreds of outboard devices, interfaces, and controllers from XTA, Meyer Sound, Lake, DirectOut, Focusrite, Universal Audio, and more.
What is a loom in live sound?▼
A loom (also called multicore or snake) is a bundled cable that carries multiple audio channels between stage and the mixing position. AUDIOPATCH lets you define looms, assign channels, and track usage across all positions.
Can I export to PDF and Excel?▼
Yes. AUDIOPATCH generates professional PDF patch sheets with hardware setup, stage input lists, stagebox outputs, loom assignments, tieline routing, and pack lists. Excel exports include color-coded loom plans and per-position sheets.
Does it work offline?▼
Yes. As a PWA, AUDIOPATCH works fully offline after the first visit. All data is stored locally in your browser. No internet connection needed for planning, editing, or exporting.
Inputliste Touring App (DE): Kann ich meine Bühnen-Inputliste & Kanalbelegung auf Deutsch planen?▼
Ja — AUDIOPATCH ist vollständig auf Deutsch und Englisch nutzbar. Du kannst deine komplette Bühnen-Inputliste (Kanalbelegung / Technical Rider), Subsnakes (Looms), FOH-/Monitor-Splits, 19"-Racks und Netzwerk-Topologien für Tourneen und Festivals planen, bestehende Excel- oder PDF-Rider per KI/Copy-Paste importieren und als druckfertiges PDF oder Excel-Patchsheet exportieren.

What's New

Ready to plan your next show?

No account. No login. Works offline. Your data stays in your browser.

Help & Feedback

Have a question, found a bug, or want to suggest a feature?
Send us an email — we respond to every message.

info@audiopatch.net